A retaining wall was built to stop erosion at the Residence and the Chicken Farm.
A banana plantation was started.
A stone sand-filled road was built between the Residence and Urukundo Village.
The inside of the Boys' Home was painted and hopefully 2011 will see the same work undertaken in the Girls' Home.
The kitchen had a remodel : poor construction required the addition of ventilators.